Kaliakra Project
Project description: Laying a 14 km, 10 "subsea gas pipeline and connecting it to the existing platform. Preparation of procedures and supervision during the Pigging Purification and Hydraulic Tests Development of procedures for connecting 1" service lines for subsea equipment.
