Reconnection of Kaliakra well - for Petroceltic Bulgaria
Project description: Engineering activities including the design and fabrication of a 10”pipe isometry, selection of a diving team, hiring of a necessary vessels for installation of the above isometry. Connection between Kaliakra well X-mass tree and main subsea gas pipeline.
- Preparation of work procedures for the diving team, deck and land personnel.
- Preparation of cargo plan
- Preparation of 4-point mooring plan for anchoring of the installation vessel.
- Control and monitoring of gas production processes including the subsea production wells, Galata compressor station and Provadiya Gas Metering Station.
- Managing and controlling the operating modes of the subsea wells and the gas turbine compressors at Galata Compressor Station.